High Quality Terminal Block Electric Motor - Precision Stamping Metal Part,Oem Stainless Steel Precision Sheet Metal Copper Stamping Part – Weiting
High Quality Terminal Block Electric Motor - Precision Stamping Metal Part,Oem Stainless Steel Precision Sheet Metal Copper Stamping Part – Weiting Detail:
1. Customers provide samples or required product drawings
You can provide us with drawings and samples of a certain product according to your own needs
2. Technical disassembly drawing analysis and testing whether it can be produced
Our engineering department disassembles the drawing analysis to confirm whether it can be produced
3. Determine if it can be produced
If it can be produced, the project will analyze the required material and material specifications according to the drawings provided by the customer, the required mold tonnage, and the production capacity that can be achieved to the business.
Product Description
Product Name | sheet metal stamping parts |
Services | OEM/ODM |
MOQ | 10000pcs |
Material | brass, phosphor copper, beryllium copper, stainless steel SUS304/301, etc. |
Surface Treatment | Tin plating, nickel plating, silver plating, gold plating, etc. |
Shape | N type, U type, W type, L type, etc. |
Color | material primary color, gold, silver, black,etc. |
Oxidation test | salt spray test |
Production equipment | Production equipment imported from Japan, and independent research and development design and mold making; High-speed precision continuous punching machine and high-speed electric injection molding machine |
Testing equipment | advanced high-precision projector, 2.5-dimensional tester and other high-standard, tool magnifying glass, microscope, tensile tester, hardness tester, ROHS tester and other testing equipment |
Certification | UL,SGS, MSDS, CE, ISO9001,ROHS,REACH, CQC,TUV,PAHS,PFOS,PFOA |
payment method | T/T, Paypal, L/C, Western Union |
Package | Plastic bag+Carton Box |
Spot delivery | 3-5 days |
Batch order delivery time | 7-15 days or negotiation time |
FAQ
Q1: What is the delivery time for this terminal connector?
A1:1)For sample, the time is About 3-5 days.
2) For bulk orders, the time is Around 7-15 days or negotiation time.
3)If it is an OEM product, you need to make a terminal mold, the delivery time is about 15-25 days, and the specific delivery time needs to be communicated. The time you receive the goods is subject to specific logistics and transportation
Q2: Can I get free parts stamping?
A2: Yes, you can get samples, provided you contact the business person first.
Q3: Which shipping way is available?
A3:Various modes of transportation. The conventional transportation method is express and air transportation, which can be specified by the customer.
Q4: Do you accept OEM or ODM?
A4: Yes, OEM and ODM are welcome. We can customize the size, shape and size of the terminal connector according to your needs , including designing new molds to customize products
Testing equipment
Testing equipment
Advanced high-precision projector, 2.5-dimensional tester and other high-standard, tool magnifying glass, microscope, tensile tester, hardness tester, ROHS tester and other testing equipment
Product detail pictures:
Related Product Guide:
We are proud of the high customer satisfaction and wide acceptance due to our persistent pursuit of high quality both on product and service for High Quality Terminal Block Electric Motor - Precision Stamping Metal Part,Oem Stainless Steel Precision Sheet Metal Copper Stamping Part – Weiting , The product will supply to all over the world, such as: Sri Lanka, Portugal, Orlando, By integrating manufacturing with foreign trade sectors, we can provide total customer solutions by guaranteeing the delivery of right products to the right place at the right time, which is supported by our abundant experiences, powerful production capability, consistent quality, diversified products and the control of the industry trend as well as our maturity before and after sales services. We'd like to share our ideas with you and welcome your comments and questions.
By Rae from Johor - 2018.07.12 12:19
Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
By Juliet from Los Angeles - 2017.12.31 14:53