Precision Stamping Metal Part,Oem Stainless Steel Precision Sheet Metal Copper Stamping Part

Short Description:

Our engineering department disassembles the drawing analysis to confirm whether it can be produced


Product Detail

Product Tags

1. Customers provide samples or required product drawings

You can provide us with drawings and samples of a certain product according to your own needs

2. Technical disassembly drawing analysis and testing whether it can be produced

Our engineering department disassembles the drawing analysis to confirm whether it can be produced

3. Determine if it can be produced

If it can be produced, the project will analyze the required material and material specifications according to the drawings provided by the customer, the required mold tonnage, and the production capacity that can be achieved to the business.

Product Description

Product Name sheet metal stamping parts
Services OEM/ODM
MOQ 10000pcs
Material brass, phosphor copper, beryllium copper, stainless steel SUS304/301, etc.
Surface Treatment Tin plating, nickel plating, silver plating, gold plating, etc.
Shape N type, U type, W type, L type, etc.
Color material primary color, gold, silver, black,etc.
Oxidation test salt spray test
Production equipment Production equipment imported from Japan, and independent research and development design and mold making;
High-speed precision continuous punching machine and high-speed electric injection molding machine
Testing equipment advanced high-precision projector, 2.5-dimensional tester and other high-standard, tool magnifying glass, microscope, tensile
tester, hardness tester, ROHS tester and other testing equipment
Certification UL,SGS, MSDS, CE, ISO9001,ROHS,REACH, CQC,TUV,PAHS,PFOS,PFOA
payment method T/T, Paypal, L/C, Western Union
Package Plastic bag+Carton Box
Spot delivery 3-5 days
Batch order delivery time 7-15 days or negotiation time

FAQ

Q1: What is the delivery time for this terminal connector? 

A1:1)For sample, the time is About 3-5 days.

2) For bulk orders, the time is Around 7-15 days or negotiation time.

3)If it is an OEM product, you need to make a terminal mold, the delivery time is about 15-25 days, and the specific delivery time needs to be communicated. The time you receive the goods is subject to specific logistics and transportation

Q2: Can I get free parts stamping?

A2: Yes, you can get samples, provided you contact the business person first.

Q3: Which shipping way is available?

A3:Various modes of transportation. The conventional transportation method is express and air transportation, which can be specified by the customer.

Q4: Do you accept OEM or ODM?

A4: Yes, OEM and ODM are welcome. We can customize the size, shape and size of the terminal connector according to your needs , including designing new molds to customize products

Testing equipment

Testing equipment

Advanced high-precision projector, 2.5-dimensional tester and other high-standard, tool magnifying glass, microscope, tensile tester, hardness tester, ROHS tester and other testing equipment

A8F59D03-611B-4FC8-BC11-32C20866E40B

  • Previous:
  • Next:

  • Write your message here and send it to us